Unfortunately they had started the demolition before we got up there to take before pictures. However I wasn't to upset because I was not very excited about taking out all the old bathroom drywall and stuff. So here is a picture of the upstairs bathroom gutted.
Upstairs bathroom after we replaced sheetrock, placed cement board in shower area, and started on drywall.
This is about how far we got on the downstairs bathroom. Dad said he could finish the drywall since he knows how to do that. We replaced ALL drywall inside of bathroom and outside walls of bathroom area, put cement board in shower area and retiled, and put in new vanity and med. cabinet, and best of all installed a vent!
This is the upstairs bathroom after we had completed it. We put in a shower upstairs!! So now they have two showers in the house. We built two small shelves in the shower for storage. We replaced the vanity upstairs and put in a new med. cabinet as well. Oh and we replaced both windows in upstairs and downstairs bathrooms.
Along with all the remodeling we did Corey and his dad spent many hours replacing all the piping in the house. It went form pvc pipe to all copper pipe.
Wow my man is amazing!!!